Need Assessment

Address

Application Area

Anwendungsbereich

Extraction Elements

∅ Extraction Arms

Extraction Arm Length

Checkboxen
System Data

Operating Time

Electrical

Explosion-Proof Design
Checkboxen
Adjustable
Run-on Time
Voltage
Monitoring
Control Cabinet Installation
Circuit Diagram as EPLAN
On-Site Commissioning by a Master Electrician (commissioned by Klepp)
Lighting
PLC Control
Automatic Start/Stop
On/Off Switch on the Extraction Hood

Installation

Installation
Floor Plan Available
Photos Available
Fire Protection Walls Present

IMPORTANT

Please consider any existing structures, installations or obstacles that may affect the installation, including:

•crane runways and overhead cranes
• walls, openings, supports, columns, windows and doors
• ceiling and installation heights
• existing pipework, ducts and cable trays
• radiators and control cabinets